All completed work
Roof and extension
Thirteen images from one house: the façade opened up and the roof stripped, and alongside it an extension that cantilevers clear — from the basement formwork to the terrace in front of it.
The roof and the façade
The front façade opened up and closed again in new brickwork, the roof stripped, and the structure seen from inside.
Foundation and the floating slab
Formwork for the basement walls, reinforcement across the full slab, and the poured floor that cantilevers on props over the excavation.
Shell and facing brick
The blockwork cantilevers over the edge beam; then come the first courses of grey handmade facing brick.
Completed
The junction beneath the glazing, the terrace in front of it, and the extension as it stands today.
A project? Let us know.
Describe your project in a few lines. Reply within 24 hours on working days.












