Work from the founder's twenty-plus years of experience, shown in the order it actually happened.

Our project

A villa in Brussels, twice the size

The house had grown too small. We took the roof off and built a full storey on top — with the house open underneath, so a schedule where weatherproofing and pace were conditions, not wishes. Fourteen months later the finishing was done too.

Steel beam with the chalk marking HEA 280, ready to be installed.
Villa Brussels · Steel beam HEA 280 · 02.03.2022
Reinforcement mesh over the hollow-core units of the storey slab.
Villa Brussels · Slab reinforcement · 05.03.2022
Finished marble staircase with glass balustrade on stainless point fixings.
Villa Brussels · Staircase finished · 13.09.2023
Kitchen with walnut fronts, composite worktop and sink.
Villa Brussels · Kitchen · 13.09.2023

Site log

  1. 25.01.2022

    Survey and measurement

  2. 28.01.2022

    Ceilings and screed stripped

  3. 19.02.2022

    Reinforcement

  4. 02.03.2022

    Steel structure, ground floor

  5. 05.03.2022

    Storey slab cast

  6. 12.03.2022

    Old roof stripped

  7. 14.03.2022

    New roof trusses

  8. 01.04.2022

    Roof closed

  9. 21.05.2022

    Staircase cast

  10. 20.06.2022

    Underfloor heating laid

  11. 13.09.2023

    Final state documented

Dates from the EXIF data of the site photographs.

Discuss your project+32 485 65 94 76

Reply within 24 hours on working days.

Before and after

The same garden, twenty months later

Same viewpoint, same path. The dates are under the photographs.

Bare garden soil with a winding natural-stone path and visible service ducts.
Villa Brussels · Garden before · 28.01.2022
Landscaped garden with the same natural-stone path, lawn and borders.
Villa Brussels · Garden after · 13.09.2023

A project? Let us know.

Describe your project in a few lines. Reply within 24 hours on working days.