Skip to content
FINE CONSTRUCTOR

Electrical

From one extra socket to a full installation: boards, circuits, lighting and a file that is ready for inspection.

Ceiling stripped back to the reed lath, plaster rubble across the floor.
Villa Brussels · Ceilings stripped · 28.01.2022

What the work involves

  • Renew or extend fuse boards
  • Run and adapt circuits during renovation
  • Lighting and switchgear
  • Deliver the installation inspection-ready

When people call us

  • The fuse board trips or has become too small.
  • You are renovating and the circuits have to move with it.
  • An inspection requires changes before sale or rental.

How a price comes about

  1. You describe the job — a few lines and a few photos are enough to start.

  2. We come and look on site, without obligation, and take measurements.

  3. You get a quote with every item listed separately, and a timeline.

  4. Anything that comes up during the works is discussed beforehand, not afterwards on the invoice.

See our project

A project? Let us know.

Describe your project in a few lines. Reply within 24 hours on working days.